2018 Ukraine Residential House
Services:

Sourcing The House With Heat And Cooling Throughout The Year

Team:

4 BIM Engineers

Duration:

6 months

Energy-Efficient Climate Control for Modern Residential Living. This residential project required the development of a complete heating and domestic hot water solution capable of providing comfortable indoor conditions throughout the year.

Karno Energy designed the engineering system from scratch, selecting an air-to-water heat pump as the primary energy source and validating the solution through technical and economic analysis.

about [ ] project

[ Challenges ]

01

Selecting the Most Efficient Heating Technology

The client required a reliable heating and hot water solution capable of providing year-round comfort while maintaining low operating costs.

Includes:
  • Energy efficiency
  • Operating costs
  • Heating performance
  • Domestic hot water supply
02

Balancing Technical & Economic Performance

Several heating technologies were evaluated to determine the most effective solution from both technical and financial perspectives.

Includes:
  • Heat pump systems
  • Gas boiler alternatives
  • Electric boiler alternatives
  • Lifecycle cost comparison

[ Solutions ]

Engineering System Design

The heating and domestic hot water system was designed specifically for the building's size, comfort requirements, and energy goals.

  • Design activities included:
  • Heating load calculations
  • Domestic hot water design
  • System sizing

Heat Pump Selection

An air-to-water heat pump was selected after comparing multiple heating technologies and evaluating their long-term performance.

  • Technologies evaluated:
  • Air-to-water heat pump
  • Gas boiler
  • Electric boiler

Optimized Final System

The final engineering solution balanced comfort, efficiency, and operating costs while fully meeting the client's requirements.

  • Final benefits included:
  • Reduced energy consumption
  • Reliable year-round operation
  • Lower operating costs

[ Scope of Work ]

The initial project scope included

Our team developed an efficient heating and hot water supply system based on heat pump technology, balancing performance, operating costs, and long-term sustainability.

01

HEAT PUMP SYSTEM DESIGN

02

HEATING & HOT WATER ENGINEERING

03

TECHNICAL & ECONOMIC ANALYSIS

04

OPTIMIZED SYSTEM DELIVERY

Development of a balanced engineering solution meeting both technical requirements and long-term operating cost targets.

[ Delivery Process ]

Step 01

System Design & Evaluation

The project began with the development of a heating and domestic hot water concept tailored to the building's size, occupancy, and energy requirements.

  • Key activities included:
  • Heating demand calculations
  • Hot water requirements analysis
  • Technology comparison study
Step 02

Heat Pump Selection & Final Delivery

After technical and economic evaluation, an air-to-water heat pump was selected as the most efficient solution for year-round operation.

  • Air-to-water heat pump implementation
  • Optimized heating system design
  • Long-term operating cost optimization

The final engineering solution provided reliable heating, domestic hot water, and energy efficiency throughout the year.

[ Results ]

The project delivered a cost-effective heating and hot water solution based on heat pump technology, providing year-round comfort and improved energy efficiency.

Construction Drawings & Output

FINAL PROJECT INFORMATION INCLUDED:

Total project area 245 m²
Building type Residential House
Location Ukraine
Heating Technology Air-to-Water Heat Pump

The final engineering solution was designed to maximize efficiency, reduce operating costs, and provide reliable comfort throughout the year:

Heating system developed from scratch
Air-to-water heat pump selected as the primary energy source
Domestic hot water system integrated into the design
Technical and economic comparison completed
Energy consumption optimized
Operating costs reduced compared to alternative solutions
System fully aligned with client requirements

KEY PROJECT DELIVERABLES

Building Area 245 m²
Heating Source Air-to-Water Heat Pump
Hot Water System Delivered
Energy Efficiency Optimized

Business value

Air-to-water heat pump solution
Reduced operating costs
Optimized energy consumption
Reliable hot water supply
Validated economic performance
Year-round comfort

[ Tools & Standards ]

Our workflows follow UK BIM standards to ensure quality, consistency, and seamless coordination across disciplines.

[ Case Study ]

Business Centre, London

View project

Sainsbury’s, London

View project

Let’s make BIM great together

We’re always open to new collaborations, partnerships, and engineering challenges.
Whether you’re planning a BIM coordination project, a full MEP design, or need an external engineering partner — our team is ready to help.

Get a Consultation